Ready to start
Small but important piece of progress - plans have been through council and approved! A small change was required at the back of the house to clear the sewer connection point. Master bedroom was reduced by 600mm, as was the upstairs living room and deck of the side of the bedroom.Earthworks should start in a couple of weeks but we did have the permanent power pole installed on Friday.
No comments:
Post a Comment