Wednesday 11 March 2015

It's been a while......

Well, we've been in our new home for over a year now so it's time for some 'lived in' photos.









More to come soon.....

Sunday 21 July 2013

Nearly there.....

As you'll see from the photos below we are almost at the finish line of this build! Only a few more bits and pieces to be fitted/wired and we should be 'home' in about 4 weeks....Enjoy.

Some new outside finished shots
 
 
Front all done!
 
 
Middle/side deck also finished!
 
 
Internal shots - Only thing left is the fitting of a few things and the final paint and clean
 
Kitchen
 
 
Study nook and sliding door to middle/side deck
 
 
kitchen island
 
 
Cooktop, window splashback with bench top stone as surround
 
 
Black tap and sink
 
Looking into pantry

Pop-up power tree

Bi-fold doors - closed

Bi-fold doors - open with screens closed

Screens closed looking in...

Screens closed looking out...

Stairs, looking from living room

Stairs, looking up....better photo of chandelier later....

Stairs, from the top
 
 Chandelier
 
Bed 1 - bedhead against this wall
 
Bed 1 - back wall with louvres
 
Ensuite vanities
 
Ensuite - her shower......

Ensuite - his shower......
 
Bathroom vanity

Bathroom...well....bath

Bathroom shower
 
Upstairs ensuite (opens to bed 2 and bed 3)
 
 
 
 
 

Monday 27 May 2013

Tiles and benchtops.

Start with a new front of house shot, was a nice day for a photo.....
 
Kitchen bench tops are now on. Pulled back some of the bubble wrap to get some photos
Bench tops are "Smartstone Pierre Bleu"
 
Single waterfall end
 
Island sink (double)
 
Walk in pantry sink (single)
 
Sinks are "Schock Signus" from Abey. In direct sunlight they have specs of red, blue, yellow, etc.
 
Study nook beside the kitchen also got the bench top treatment, just need to decide on a colour/finish for around the window
 
 
Laundry, fitted out and tiles going on
 
Upstairs bathroom well underway
 
Close-up of door and bench colour
 
(looking south)      Upstairs ensuite      (looking north)
 
Upstairs WC's vanity unit
 
 
That's it for now, next update should be the downstairs powder-room and ensuite finished
 

Wednesday 15 May 2013

Kitchen has arrived

The kitchen has been installed over the last couple of days. A few minor issues with wiring for lights but all went well. Templates were taken for the bench tops so they can be made over the next week or so and will be installed later. (photo quality is a bit average, bad light....insert excuses here).
 
Back wall - ovens on the right, cooktop in the middle and wine fridge in the space on the left.
Front of island - 6 cupboards 300mm back under front edge of island top 
 
Study nook and fridge space
 
Back of island. 2 x 4 drawers either end, bin on the right, two spaces for F&P dish drawers that will have matching fronts with utility drawers under both
 
Cooktop to go in the middle. Mosaic tiles to go around the window
 
Main utensil drawer under the cooktop
 
Pot drawers under the ovens
 
Pull out bin drawer in the island
 
Walk in pantry bench, sink will be done the far right end. Shelves and broom cupboard are on the right of the door
 
Sink for the walk in pantry