Well, we've been in our new home for over a year now so it's time for some 'lived in' photos.
More to come soon.....
PAB's new Digs
Wednesday, 11 March 2015
Sunday, 21 July 2013
Nearly there.....
As you'll see from the photos below we are almost at the finish line of this build! Only a few more bits and pieces to be fitted/wired and we should be 'home' in about 4 weeks....Enjoy.
Some new outside finished shots
Front all done!
Middle/side deck also finished!
Internal shots - Only thing left is the fitting of a few things and the final paint and clean
Kitchen
Study nook and sliding door to middle/side deck
kitchen island
Cooktop, window splashback with bench top stone as surround
Black tap and sink
Looking into pantry
Pop-up power tree
Bi-fold doors - closed
Bi-fold doors - open with screens closed
Screens closed looking in...
Screens closed looking out...
Stairs, looking from living room
Stairs, looking up....better photo of chandelier later....
Stairs, from the top
Chandelier
Bed 1 - bedhead against this wall
Bed 1 - back wall with louvres
Ensuite vanities
Ensuite - her shower......
Ensuite - his shower......
Bathroom vanity
Bathroom...well....bath
Bathroom shower
Upstairs ensuite (opens to bed 2 and bed 3)
Monday, 27 May 2013
Tiles and benchtops.
Start with a new front of house shot, was a nice day for a photo.....
Kitchen bench tops are now on. Pulled back some of the bubble wrap to get some photos
Bench tops are "Smartstone Pierre Bleu"
Single waterfall end
Island sink (double)
Walk in pantry sink (single)
Sinks are "Schock Signus" from Abey. In direct sunlight they have specs of red, blue, yellow, etc.
Study nook beside the kitchen also got the bench top treatment, just need to decide on a colour/finish for around the window
Laundry, fitted out and tiles going on
Upstairs bathroom well underway
Close-up of door and bench colour
(looking south) Upstairs ensuite (looking north)
Upstairs WC's vanity unit
That's it for now, next update should be the downstairs powder-room and ensuite finished
Wednesday, 15 May 2013
Kitchen has arrived
The kitchen has been installed over the last couple of days.
A few minor issues with wiring for lights but all went well. Templates were taken for the bench tops so they can be made
over the next week or so and will be installed later. (photo quality is a bit average, bad light....insert excuses here).
Back wall - ovens on the right, cooktop in the middle and wine fridge in the space on the left.
Front of island - 6 cupboards 300mm back under front edge of island top
Study nook and fridge space
Back of island. 2 x 4 drawers either end, bin on the right, two spaces for F&P dish drawers that will have matching fronts with utility drawers under both
Cooktop to go in the middle. Mosaic tiles to go around the window
Main utensil drawer under the cooktop
Pot drawers under the ovens
Pull out bin drawer in the island
Walk in pantry bench, sink will be done the far
right end. Shelves and broom cupboard are on the right of the door
Sink for the walk in pantry